Pet木饰面
Your current location : HOME >> News >> Technical Information

et wood veneer manufacturers detail the construction preparation of siding

2022-03-14 17:27:33
second

    1. Construction preparation of wood veneer siding:

    Prepare the raw materials of the siding in advance: the greening plants of the relevant wood, the grade of the material and the corresponding specifications and models need to be carried out in line with the quality regulations of the design scientific research engineering drawings, as well as the relevant laws and regulations on the engineering construction and engineering acceptance work system. The keel material is selected to use light steel structure keel. The control panel must be smooth in texture, uniform in color tone, similar in texture, and free from defects such as scars, gaps, distortions, and discoloration.

    Spare parts: moisture-proof paint, fire-resistant paint, wall paint, steel nails: the length and short specifications should be 2-2.5 times the thickness of the plate; nails can also be shot.

    Key work machines: electric machinery and equipment (small table saws, small table planers, hand drills, guns); hand-held special tools (wood planers (large, medium, small), groove planers, wood saws, fine teeth, knife saws , axe, hammer, flat shovel, punch, screwdriver; square ruler, cutting square, small steel tape measure, gray wood veneer horizontal ruler board, line pendant, ink fountain line, etc.).

    2. In the work of wood veneer siding

    First find the location and identification: the installation of wood wall and wood tube board should be based on the design regulations, first find the good building facade, plan location, vertical specification, shell line.

    The second is the nuclear embedded parts and the edge of the hole: after laying out the lines, check whether the embedded parts and wooden bricks can meet the requirements of design and assembly, and the key is to check whether the sorting interval, specifications, and position information can meet the requirements of nailing keels; Whether the production of doors and windows, the position of the side of the hole, the specification data information is square and upright, and whether it must be consistent with the design development trend.

    Then apply moisture-proof and anti-corrosion materials: wooden retaining walls and wooden cream cheese boards with moisture-proof and anti-corrosion regulations are designed, and moisture-proof and waterproof membranes are pressed when nailing the keels, or moisture-proof glass fiber reinforced plastics are applied before nailing the keels.

    3. Keel configuration and installation:

    Wooden siding keel: Be sure to apply fire protection and safety protection architectural coatings according to the basis.

Pet木饰面厂家详细介绍护墙板的施工准备

label

0
Last:None
Next:None

Recent browsing:

Related products

Related news

Ningbo Zhiyan New Material Technology Co., Ltd

Contact: 18967888788 Manager Zhang

Email: zhiyanxc@163.com

Website: www.nbzhiyan.com

Address: 5th Floor, Hanxuan Building, Zhenhai District, Ningbo City


Message

木饰面厂家

WeChat public

Pet木饰面

Mobile website